Wednesday, September 12, 2012

10 ways to guarantee BIM failure!

First 9 of them are real case stories that led to failure. 10th has not yet but still very dangerous;)

 
1- Don't hire an experienced BIM Manager.
 
2- Don't train your team properly.

3- Find someone from your organization whose maximum interaction with latest technology is iPhone and make him BIM Manager.

4- Make sure that the above BIM Manager thinks that he knows all about BIM because he attended some seminars and read some case studies.

5- Don't get training and never ever run a small pilot project to fully understand the capabilities of the BIM Tool before making mass number of license. Instead, just rely on vendor's word.
 
6- See the BIM requirement chapter in the tender documents and say "oh well, we will think about it if we get the project".

7- Believe that there is only one "way" to succeed with BIM on each project.

 
8- Believe that having a model only for coordination is BIM and you can produce shop drawing with the traditional method which has nothing to do with BIM. Further more claim this is much cheaper.

9- Prefer ideal workflows to realistic ones.

10- Final and the most important one: Be arrogant to Diyane and irritate her although she is nice, kind and respectful towards you:)


Congratulations! You are ready to fail now:)))

Have a wonderful day without any failures!
Diyane Koseoglu
www.bimes.com

Saturday, September 8, 2012

Maybe IFC works better in cold regions, especially under -20 degrees:)

A couple of days ago, I was speaking with one the Graphisoft Product Managers and I mentioned him that IFC is not the most trusted file format in the Middle East.

After this statement of mine, I was expecting a response like this:

"Ohhh I know! It has to be developed further but we are fully dedicated to OPEN BIM and we believe IFC is the future."

But no, that wasn't the answer.

He was pretty much surprised with my statement and he said he was recently visiting large Scandinavian contractors using ArchiCAD and they were extremely happy with IFC.

WOW! Very unexpected answer!

Since then I have been trying to find a good answer why IFC has totally different reputation in the Middle East and Scandinavian countries. Following are the possibilities I could think of:

  • Maybe it's easier to manage IFC files on smaller projects.
  • Maybe Scandinavians are more experienced with BIM.
  • Maybe Scandinavians has lower expectations from IFC and they are happy with whatever they get:)
  • Maybe IFC works better in cold regions, especially under -20 degrees:)

 Puff! I really don't know!

Have a great Sunday!
Diyane Koseoglu
www.bimes.com

Sunday, August 5, 2012

Manicure and BIM Services

I was extremely impressed when I had my first manicure in Dubai.

The manicure artists gave me maybe 254 facts about nails, cuticles, fingers and even how to polish the rings:)) End result was also amazing... Nails were perfectly smooth, the fingers looked longer and thinner then they are!
Image from Sera Beauty Lounge

Of course I asked her how come she knows so much about nails and gives the same shape and smoothness to each nail. Her reply was quite simple.

She has been  doing this for 5 years and she has been getting weekly trainings on the new products, trends and massage etc.

Experience and Continious Training! Key to the success!

It sounded very similar to my reply when our clients ask how come BIMES is so productive?

1- We have a very experienced team!
2- We have 2 full time engineers dedicated to develop workflows, modeling guides and best practices.

What do these 2 do during the day? They basically try find answers to the questions below:
  • At what stage should we add concrete grade to the model? 
  • Which team should add such info? 
  • How much would it slow that specific process? 
  • How much would it speed up the next process?
  • What more can we add to the template to speed up the modelers?
Is this all? No!  They also:
  • Create internal training videos on company standards so that our experienced team members do not spend much time on training/replying the new members.
  • Update company templates
  • Create custom components (we even sold some of our developments to the vendors:))
  • and many more
(Some of these were shared with you as well.)

As you see, success is no coincidence:))

Have a great day!

Diyane Koseoglu
www.bimes.com

Sunday, July 15, 2012

Some Advise for Contractors that are Planning to Outsource BIM Services

More and more contractors in the ME are planning to outsource BIM Modeling to specialized solutions providers like us and of course more and more new companies are poping up like mushrooms everywhere.

For me it's very very interesting to see the way some of them provides commercial proposals.

Let me first start with explaining the way we provide the commercial proposals for contractors.

  • Get the project design drawings.
  • Our technical team studies the project and even starts modeling to see the quality of the drawings and challenges of the project.  This might sound too much for some of you but it is not. Actually I am very happy with this step as certain things might seen very simple at first glance but when you go into details it might turn into a nightmare. Thus it is crucial to experiment if you want to provide a reliable proposal. I am a big fan of this step since I do not like last minute surprises:))
  • Prepare a BIM Execution Plan and present it to the client. We go through every and each detail in the project and explain the client our methodology and the details of the delivery. This is the stage our clients start to speak the same language with us. They clarify what they want exactly and we tell them which ones are possible and feasible. I see this process as an educational phase for our new clients.
  • Provide a Scope of Work, BIM Inclusion List (Which element will be modeled in 3D, what will be entered as data etc), sample model and shop drawings (not any sample, the model of their project).
  • Once we agree on the BIM Execution Plan and Scope of Work then we provide our final Commercial  Proposal.
All this process takes 2-4 weeks for us and we submit around 40-60 pages. But at the end of the project our clients are happy and we deliver every single document we promised on time since we studied it thoroughly.

However I saw some new companies in the region quoting even 1/3 of our pricing lately. Well, this doesn't make sense at all. No execution plan... No Detailed Scope of Work... No BIM Inclusion List... No shop drawing sample... Just a 2-3 page commercial proposal...

And unfortunately sometimes the client takes only the price as the criteria and then the nightmare starts.

Usually they do get some sort of model but no shop drawing on time. And you know the construction guys on site do not read models. They need shop drawings. If they don't receive it on time then it is a BIG problem.

Unfortunately I saw some cases even the person who made the decision on BIM Service Provider lose their jobs as delaying the contractor even one day is no joke.

So, please be careful when analyzing the proposals and make sure that  the BIM Service Provider understands your exact needs. More importantly make sure that they are have to be construction background and understand the needs of the contractor. Ask for BIM Execution Plans, BIM Inclusion List agree on the exact deliverables.

Otherwise you may end up with some fancy software boxes and a dummy model.

Good Luck,
Diyane Koseoglu
www.bimes.com






Wednesday, May 30, 2012

If you want to mandate BIM in your project...

Hi Everyone!

As you know BIM is being mandated in many projects in the Middle East and I had seen many of them so far.

Most of them were pretty strange:))) You do not understand what they want when you read the whole document.

I remember getting confused many times.

But recently I learned more about the people who prepares these BIM Specs and my confusion is over now:))

Well, some of them are prepared by people who attended few BIM Seminars only and think they understands BIM very well.

This is quite dangerous for the owner since BIM is much more deeper than what is shown in the seminars. Plus, nobody shows the handicaps of BIM in the presentations:))

If the specs are prepared by someone without deep experience of both BIM and Construction, be ready to get screwed.

If you want to specify BIM in your project make sure that you know what you are talking about.  Otherwise BIM can be an additional cost rather than saving.

I saw many failures because of this reason!

Please don't be one of them and have a great evening:))

Diyane Koseoglu
www.bimes.com








Sunday, April 8, 2012

Which BIM Software is the Most Popular in the Middle East?

Which BIM Software is the Most Popular in the Middle East?
This is the "most popular" question I receive after explaining BIM is not a software itself:))

Isn't it a bit strange? Popularity is a strange criteria when you are trying to select a system for your business that will increase your competitiveness.

I want to be better than others but I want to do exactly the same what others do!

Strange way of thinking:))

I understand it is very time consuming to investigate all the technical details of the available software in the market and humans have tendency to laziness, but isn't this an important decision?

If I were you, I would first make a web search eliminate the candidates to 2-3 and then get full training on them. Then you will be able to make a healthy decision.

Have a great week!

Diyane Koseoglu
www.bimes.com




Sunday, March 25, 2012

BIM for IT Team


Image from adamr

IT team! They are "the team" I always respect a lot and try to have good relations with since they know everything that I do not:))

However the client visit I had yesterday was exactly the opposite case.

Let me tell you the story in more detail.

Our client is a very strong BIM Server user! They deal with large projects and large teams so BIM Server is the technology they can not live without. Since it is so vital for them every architect and engineer in the BIM team knows BIM Server inside out.

Don't tell me "Ohh it's so simple! What can they know more than "Send&Receive? "

Well, restoring the BIM Server with all users, rolling back the projects, migrating the server to a different computer are not complicated commands for them.

But these are the architects and engineers not the IT guys.

To be honest, we made a mistake with them during the BIM Implementation. We did not manadate the IT team to attend the trainings, especially the BIM Server training.

What is the consequence of this mistake?

Image from Victor Habbick

 Whenever IT guys touch any computer  of the BIM Team, they "destroy" something:)) But they really do destroy.




Image from Ambro
So now, the BIM guys do not want anyone from IT to enter their room even. They even told me the two computers that they never let IT to touch are working perfectly. The rest? No comment:))

Actually the problem is IT has no idea about the consequences of their modifications on BIM Server. They claim what they did was a tiny little innocent change.

What is the lesson learnt from yesterday's visit?

BIM Server Training for IT!

We will start working on a 1-Day course tailored for IT. The course will cover license sharing, basic trouble shooting and BIM Server.
 Image from digitalarts

Hopefully this will bring peace to IT and BIM team's relationship:))

PS: Jothi's latest video about how to restore your BIM Server including users, projects, libraries and access rights in Windows OS is now available.



Diyane Koseoglu
Jothi Shanmugam
www.bimes.com



Thursday, March 22, 2012

Is BIM luxury for your business?

As you know I have been meeting with designers, contractors, project managers and owners regarding to BIM Implementation.

In majority of these meetings, the top management knows the term BIM.

But still there is a common perception of BIM as a "Luxury" item and they need to get BIM only if they have surplus in their budget.

This is quite strange to me.

What we discuss in the meetings is simple! In all the large projects BIM is mandated currently and this is getting more and more common everyday.

Everyone agrees because most of them has also seen the tender documents where BIM is mandated.

Now what do you expect to happen?

If it was me, I would take BIM as a MUST TO HAVE technology to keep my business in the game!

But what happens in real life is usually the opposite. Especially the contractors still continue questioning the technology. Is it really more productive? How much would it save in a project? Why do we need to change?

Come on! We are no longer in early 2000s! I shouldn't be hearing these questions in 2012. Especially after you guys seeing all these tenders!

Sometimes I feel like the older generation construction professionals avoid "change" as much as possible.

It kind of reminds me this image I saw on Facebook today:)


We will see the days people are no longer questioning BIM insallah:))

Cheers and have a fabulous weekend!

Diyane Koseoglu
www.bimes.com


Wednesday, March 21, 2012

ArchiCAD is not BIM

1000:

"ArchiCAD is not BIM"


This statement has been googled twice this week and - like a black humour - ended up on this blog:))

Now these are the thoughts going through my mind:

  • Even on Wikipedia Graphisoft ArchiCAD is stated as the first BIM software. Don't people know this?
  • Why would you make such a search? Seriously, what do you hope to find?
  • Himm! What would be the other results in such a search? (I tried! See my result below)
  •  Why didn't BIMES blog appeared in the search? Himm I should learn more about SEO:))
  • Himm! This can be the topic of today's post.
 GOTO 1000:

 Diyane Koseoglu
www.bimes.com

Monday, March 12, 2012

How to restore your BIM Server including users, projects, libraries and access rights in Mac OSX

After a long long time, we have a technical post about ArchiCAD and BIM Server.

In this video, Jothi explains how to restore your BIM Server including users, projects, libraries and access rights in Mac OSX. It's quite easy and a real time saver.


Enjoy!

Diyane Koseoglu
Jothi Shanmugam

www.bimes.com

Monday, March 5, 2012

Who gets the highest benefit from BIM?

Who gets the highest benefits from BIM in a project?

Owner ?
Consultant / Designer ?
Contractor ?
Facilities Manager ?



Well, I do not want to go into the details of BIM Benefits and try to calculate who gets the most of it. Instead I will just look at the Middle East Market and compare the BIM usage by company type.  The statistics are taken from Middle East BIM Report 2011 by Building Smart Middle East - North Africa - India.


As you see the highest BIM Usage rates belongs to  Governments, Developers (they are basically acting as owners) and Facilities Managers.

 Who is the winner? Owners or Facilities Managers?

According to the statistics, it should be Facilities Managers with 44% but I do not feel comfortable saying it.

I have been in BIM business for the last 8 years but the number of Facility Managers that I met using BIM is less then the fingers you have in one hand. I believe the number of Facility Managers attending the survey was very limited so it did not reflect a correct result.

However in the Middle East the main driver of BIM is Owners by mandating it in their projects. Mandating BIM usage in a projects might seem like increasing the project cost but when you compare it to the benefits you will receive you notice that BIM cost is almost nothing.

Chuck Eastman's BIM Handbook summarizes the usage of BIM by Owners as following:
"
  • Increase building performance through BIM-based energy and lighting design and analysis to improve overall building performance
  • Reduce the final risk associated with the project using the BIM model to obtain earlier and more reliable cost estimates and improved collaboration of the project team
  • Shorten project schedule from the approval to completion by using building models to cooordinate and prefabricate design with reduced field labor
  • Obtain reliable and accurate cost estimates through automatic quantity takeoff from th building model, providing feedback earlier in a project when decisions will have the greatest impact
  • Assure program compliance through ongoing analysis of the building model against owner and local code requirements
  •  Optimize facility management and maintenance by exporting relevant as-built building and equipment information to start the systems that will be used over the lifecycle of the facility
"

PS: Apologies for neglecting the blog lately. I have been quite busy and since I ran out of funny topics it's taking me longer to prepare the posts:(

Diyane Koseoglu
www.bimes.com




Sunday, February 26, 2012

Can consultant's BIM Model be used for construction?

Can consultant's BIM Model be used for construction?

This is the popular question of last few months?

Let me give you some background information before going into the discussion. Especially in the UAE almost all the large consultants are already using BIM. Of course with different level of expertise and success. However compared to the contractors, consultants are BIM gurus:)

So, what happens in a project?

Image from Ambro

The consultant educates the client about BIM and recommends to mandate BIM usage in the tender. Client is happy because he thinks he already have the BIM Model so the contractor will only operate it.

The consultant hands over a LOD 300 model with no/limited liability.

The party starts here!

Contractor believes that he can use consultant's model for shop drawings, quantities, cost planning, scheduling etc.

I have experienced this myself. When we told the contractor that the model coming from consultant can not be used as it is, they do not want to believe and most of the time they do not believe.

Now, let's imagine a project in which the design consultant hands over a LOD 300 BIM Model. (If you are not familiar with LOD please check James Van's blog! It is pretty cool)

First of all, we should define what is LOD 300.

"LOD 300 - Model elements are suitable for the generation of traditional construction documents and shop drawings.  As such, analysis and simulation is authorized for detailed elements and systems."

When a contractor reads the above statement, he is quite sure that the model will work fine for him. Unfortunately what a consultant understands from "shop drawings" is slightly different than contractor's understanding.

A basic example. A consultant can use a multi-story column might work fine for the shop drawings of a consultant but it should be from slab top to slab bottom in contractors model.

The consultant does not care about the concrete grades but for contractor it is very important.

Even for design coordination! Many people believes that clash detection within a LOD 300 model is perfect. But not really! In a complex project, the slight difference on the radius of the bend might create a clash in LOD 400 model where LOD 300 is absolutely ok!

What do we usually recommend for contractors?
If the consultant does not accept "full" liability on the model, do not rely on it.

Freeze the consultant's design model as a reference model and create your own. You might create your own model by just modifying and developing the design model but we saw cases in which it is much easier to create the model from scratch. So evaluate both options.
Image from jscreationz

Have your own BIM team since you can not freeze the design model forever. There will be changes. Your BIM team should update your model continuously.

Yes, I know it does not seem very productive but it will still be much more productive than the traditional system. Plus it will be much more accurate.

Diyane Koseoglu
www.bimes.com




Enhanced by Zemanta

Wednesday, February 15, 2012

Diyane's Top 10 ArchiCAD Features - # 2

# 2 - BIM Server

I hesitated  a lot about placing BIM Server to Number 2 or 1.

It ended up getting the Silver Medal:)

Why BIM Server made it's place to TOP 2?

 1- During the development of BIM Server, I had the opportunity to see the development team, the amount of work put into it's development, the cautiousness for the safety of data. I think it had the longest beta testing period ever. Users were dying to get the BIM Server as soon as possible but Graphisoft refused to release it until they are 100% sure that it works perfectly.  

2- IT IS FAST!


3- IT IS PROBLEM FREE! Believe me or not, we are providing more technical support on the Network Dongle sharing then BIM Server:))

4- IT IS USER FRIENDLY!  This is very important. You spend 6-8 hours of your time on this software and you would hate your life it wasn't user friendly. 

5- Internal Messaging System! Off this is one of my favorites. In one of our early implementations we were using it even for deciding what to eat:))
In 2009, when Graphisoft released it, I was expecting  the competition to come up with a similiar solution which utilizes Delta Server technology within 2-3 years.

It's 2012 and still no one is even close to Graphisoft's BIM Server!

Enjoy using the cutting edge technologies of Graphisoft:))

Diyane Koseoglu
www.bimes.com

Wednesday, January 25, 2012

Can "Priority" settings in ArchiCAD make you 32 times faster than other BIM Tools?

Model based quantites!

New starter to BIM usually believes that if you have a model you can extract accurate quantities out of it.

But not always! Accuracy depends on the method of modelling.

For instance, designers/consultants models the columns from slab top to slab bottom so the model is also suitable for analysis software.

However, contractors prefers modeling from slab top to slab top due to the quantity surveying standards in the Middle East.

If you want accurate quantities from your model you should develop a "Modeling Guide for QS".

When you start preparing the standards, things will get more and more complicated as soon as the other construction elements such as walls, beams etc comes into the game.

However with the right priority seetings in ArchiCAD, you can manage to get accurate quantities without worrying to much about the modeling method.

This was the main reason that our BIM Service Team selected ArchiCAD as the main BIM Modeling Tool.

During our evaluation we noticed that due to the unavailability of "priority" settings in other BIM Tools, you have to find workarounds  by clumsier modeling methods which increases your modeling time 32 times compared to ArchiCAD.

We did our tests on a very simple model. (See below image)

If you set the priorities right, ArchiCAD will deduct the overlapping quantities such as column&wall or beam&beam intersections. However in other BIM Tools we have tested, you have to create individual walls in between columns since there is no other practical way of deducting the quantities.

Yes, ArchiCAD increases our BIM Service Team's productivity so our boss is in love with ArchiCAD:)))

SO WE ARE:)

Diyane Koseoglu
www.bimes.com


Enhanced by Zemanta

Tuesday, January 24, 2012

Is BIM Getting out of Control?

"In your opinion, what do you think is the best performing 3D design software package on the market, in order to undertake quality 3D modelling on a BIM project?"

 The above is the title of a poll in LinkedIn.

When I see things like this, I feel the word "BIM" is getting out of control.

Not sure since when SketchUp is accepted as a BIM Solution?

People seems to forget about the "I" and focuses on "B" and "M".


Image representing Vico Software as depicted i...Image via CrunchBase
But then look at the VICO software which I totally respect the way it brings new dimensions to BIM.  I always believed that VICO is the right BIM solution for contractors, project managers, cost planners and I definitely find it very smart that they do not have modeling tool but they import models from almost any BIM tool.

Now, here comes the confusion for me.

VICO can import SkecthUp models and add 4D and 5D BIM to it basically.

So you can convert a 3D BM to 4D & 5D B"I"M.

Would I do that?

Probably not:)) But it is good to have the option:))

PS: I guess you all know which one I voted for:))

Diyane Koseoglu
www.bimes.com
https://twitter.com/#!/BIMESmarketing


Enhanced by Zemanta

Saturday, January 21, 2012

Very Big Problem!

I returned from my meeting and while saying hi to everyone I noticed the strange look on Jothi's face.

DK:
"Jothi, is everything OK?"

JS:
"No! Big problem, Diyane, very big problem!"

Oupps! Jothi is normally a very calm person and this was the first time I heard such a sentence from him.

He said our biggest client in the UAE moved their office and IT guys deleted the former user account and created a new one but they forgot to backup the BIM Server. Instead they copied some files which the BIM Server does not have access!

Yes, definitely a BIG problem!

I can freak out with small things such as being late for a meeting but when it comes to really BIG stuff I am usually very very calm.

As you can imagine this time, I was very calm as well:))

I calmly said "Don't worry Jothi! I am sure there is a way to access to those files. Please explain me exaclty what they have done."

This is usually the best way to solve a problem.

While summarizing the problem, he will either find a solution himself or somebody in the office will hear and come up with a genius solution:)

In our case it was both! Jothi solved half of it and Daniel helped with the remaining half.

All these happened last Thursday afternoon and every single person in the office was supposed to travel during the weekend and it would be only me and our office admin who would be left in the office.

Obviously it will be my "pleasure" to fix the problem on site since no one else is in town from the technical team:))

This means I have to learn all these tiny little tricks Daniel and Jothi has just discovered!

Aiaiai!

I took my notebook, sit next to Jothi and start listening!

Oh my god!

I didn't understand anything in the first run! This means many people will have the same experience!

"Jothi, let's make a favor to the ArchiCAD world. Record this as a tutorial please so that we can share. I am sure there will be people who would experience similar problems and this video will save their lives:)" I said.

Of course it saved me from taking pages of notes as well:)))

Here comes the video... I hope you will enjoy it.


PS: I visited our client's office on Saturday and fixed the problem with the help of this video:)) Thanks Jothi:))

Diyane Koseoglu
www.bimes.com


Tuesday, January 17, 2012

Hiring the right people for your BIM Team!

There is a very popular topic in linked in.

ArchiCAD vs Revit


701 comments so far and it is increasing every day.

At the beginning it was quite interesting.
But after  a couple of weeks I lost interest.

The main reason was comments were basically repeating the same things with different words.

(some comments were too long and boring as well.)

A couple of days ago, I saw few interesting comments and returned back to the popular, old topic.

People were discussing the availability of architects/engineers with the knowledge of a specific software is a criteria for selecting BIM software to use.

Well, if a company hires me just because of the software skills I have, I would be quite offended and probably would not accept the job.

I think an architect or an engineer should be more than the software s/he uses.

Last year, we provided an HR consultancy service for a medium size contractor. Our responsibility was to test the applicant's ArchiCAD BIM skills.

We have interviewed around 10 persons and some of them were quite good actually. We wrote our reports and send with the actual test results?

Guess what happened?

They did not hire any of them. They hired an architect with 0 BIM knowledge!

Yes, he did not know anything about BIM but he was smart, experienced and a very good architect.

I think this was the right decision.

We trained their new architect for 10 days and applied the same test and his result was the highest so far.

So, be smart! Select the best BIM Software based on your company needs and hire good people!

Success will be inevitable!

Diyane Koseoglu
www.bimes.com
Like us on Facebook


Saturday, January 14, 2012

Shell Tool in Action!

Middle East!

Where the dreams of Architects come true!

The tallest, the most slanted, the biggest, the most luxurious, the most sustainable buildings... They all come true in this part of the world!

Our clients... They looove free form designs... My colleague Jothi receives a lot of questions about the new Shell Tool.

We wanted to share one of the recent ones.

This is one of the facade elements that our client designed by using ArchiCAD Shell Tool. At this stage I can not tell / show you more about the rest of the project but we will publish the case study soon.  As you know we need to get approvals etc.

Anyway, our client modeled it but since they were still in the design process

- sketch...
- model...
- nope... let's change here a bit more....
- modify..
- seems ok...
- not really... let's change here...
...
...

They ended up with so many operations and the result element was basically freezing even their super computers.

By the time, we received the model the design was final. So Jothi just made a "reverse engineering" and modeled the same geometry by using the same "Shell Tool" and operations. The result is a lot more lighter tough since he worked a bit more cleaner...

For the curious ones, here you have a video showing how to model it in a few steps.


Enjoy!
PS: The video is uploaded to YouTube but  YouTube is being a bit nasty today. Although it has been more than 8 hours it is still not listed in the searches. Anyway, here comes the YouTube link!

Diyane Koseoglu
Jothi Shanmugam
www.bimes.com

Tuesday, January 10, 2012

Is face-to-face training really required for learning BIM Software?

Hi All,

Lately we are receiving a lot of requests for ArchiCAD and VICO trainings due to the increasing popularity of the BIM in the Middle East region.

Face-to-Face training requests from companies is understandable for me since they usually have special requirements and a tailored training suits them more. Plus their needs are more on the "process" rather than the actual tool in most of the cases.

However when it comes to individuals, I am not sure if face-to-face trainings of ArchiCAD and VICO is really needed. Both softwares have already enormous amount of Interactive Training Guides on their websites.

Even in our company, if a new team member has lack of knowledge on ArchiCAD Collaboration, we do not conduct a training for him. We just give him the link to the ArchiCAD Collaboration Interactive Training Guides (ITG).

Both ArchiCAD and VICO ITGs are very user friendly (we can even call them as idiot proof) and efficient. For instance, someone who is totally new to ArchiCAD can learn the essentials of the workflow with in 8 hours. ITG will be take you through the core  design, design-development and documentation concepts and techniques of ArchiCAD and by the end of 8 hours you will have a completed 10.000 m2 office building project:)


You can download ArchiCAD Essentials ITG from here.

VICO has similar videos specifically targeting Cost Planners and Schedule Planners.


You can download the VICO Training Videos from here.

So, everything is available on the net for FREE! Self-study them and keep your skills up-to-date with market requirements.


Enjoy!